APPLICATION FOR REMODEL FOR EXISTING SYSTEM |
Overview
Over 27 years, the Lighting Control System that has been installed at domestic market for over 2,000 projects are continuous developing. At the early days of business, we have imported the GE TLC System and this TLC System changed for localization to fit in domestic market. The name for the old system is still the same for TLC System but we managed to develop the new system which is the SLC System that smaller size version of TLC System. Through the iLC System, we have managed to fully localized the system by ELC System. Our ELC System which is the Lighting Control System has been upgraded in function, design and durability. These systems have been developed within the same protocol range and as a result of upgrading within such basic specifications, it was possible to be compatible with older system.
Application
Within the scope of basic concept, the most major products which has been upgraded recently are listed in the next picture. The most important parts of the old Lighting Control Panel are Relay & PCB Board. It is anticipated that relays with long life will be replaced therefore consider replacing the existing Lighting Control Panels with inexpensive new Relay Modules. The switch in the building is determined for its function & design. When a new switch or a smart switch is replaced, the value of the building can go up. Replacement of the central monitoring device is also associated with the durability of the computer. The new software will enable more efficient Lighting Control operation with more power functions. |
Improve performance and value by improving the aging buildings w/ the existing MRBAS lighting control system!
Existing lighting control system replaceable items |

The lighting control business of MRBAS
started in 1991 and continues for 28
years as of 2018. In 28 years, MRBAS has been continuously upgrading the lighting control system installed about 2,000 project sites in Korea. At the beginning of the project, we imported the GE TLC system, manufactured and delivered to the domestic site. The name of the existing system was the TLC system. and the SLC system was designed new and made smaller in size. Through the recent ILC system, MRBAS lighting control system is fully localized by ELC system ultimately and has been upgraded in function, design and durability. These system have been developed within the same PROTOCOL range. As a result of upgrading within such basic specifications, it was possible to be compatible with older systems.
|
MRBAS system service responsible for
everything from beginning to end and a new
product is compatible with existing systems
and can operate reliable lighting control
conveniently. Previously used software upgraded the operator’s convenience and function, and more powerful function enables effective lighting control operation. It can increase the reliability of the system by replacing old transmission equipment to new transmission equipment. Also, the most important parts of the old light control panel are relay and PCB board. It is anticipated that relays have reached the end of its useful life may replaced. Might consider replacing existing lighting control panels with new relay modules. The switch in the building is a function and design. The value of a building can be increased by replacing a new switch and a smart touch switch. |