메뉴 건너뛰기

XE Basic

About 50,000 square meters of floor area and 24 floors of GangNam N Tower is rapidly emerging as a landmark in Teheran-ro. It is install individual air conditioning and heating by putting outdoor space on each floor. Provides abundant power capacity (7,000 Kva) and two generators for emergency power. In addition, received 1st grade earthquake rating, 1st grade energy efficiency, and the highest grade of eco-friendly architecture. Since IBS technology has been introduced to the building, GangNam N Tower receiving great attention.
MRBAS participated in the design from the construction planning stage of the above site, and the advanced IT system is being implemented with the completion in Sept. 2018. In the case of main system failure, it is possible to operate by server duplication of central control unit. The facility control system uses the VAV diffuser installed in the high/low section control the supply fan inverter control operation by the static pressure sensor. Proportional control of combined valve for heating/cooling according to setting temperature. Advanced BAS system such as enthalpy operation was established according to temperature and humidity. All the air conditioners and heat source equipment pumps are operated automatically of inverter frequency in each sensor by PID AUTO TUNING to maximize energy savings. The power control system adopts the reliable international protocol IEC61850 relay to establish a stable power supply line. In the case of the lighting control system, the Stand Alone lighting control panel and the wireless dimming module are adopted to use because it provides 24 hour stable system function and does not need to worry about independent control of each region and system failure. Also, in case of an event (fire, intrusion, etc.) occurs in the integrated SI system. it is informed by a pop-up on a large screen, and give commands to individual systems to respond appropriately to the situation.

PRINT


태그 List