Railway & Subway Pohang–Samcheok Tunnel
2025.01.22 10:34

The lighting control systems for the tunnel sites connecting Pohang and Samcheok were installed across 13 stations and 3 offices. A total of 205 4sRM units were installed, covering 820 points.
2025.01.22 10:34

The lighting control systems for the tunnel sites connecting Pohang and Samcheok were installed across 13 stations and 3 offices. A total of 205 4sRM units were installed, covering 820 points.